Construction time 5 months.
The total area of 3300m2.
Zero-cycle structures: Pile foundation, plinth triple-layer reinforced concrete slabs, floor – fiberglass slab on elastic base.
The frame consists of reinforced steel prefabricated columns, the cover – steel trusses. A spatial communication system combines individual structural elements into a single, stable structure.
Technical and work designs of constructions were prepared, project supervision was performed.